CapitelistHelp Center

Intermediate guide

Step-by-step guide

Open Movement Contributor Detail

Inspect a single asset or liability movement contributor to understand what changed and why.

Use Largest positions to decide which contributor deserves record-level review.

Before you start

Open a contributor detail when one record appears to drive an important movement or review question. The goal is to connect a dashboard-level change to the actual asset or liability fields behind it, then decide whether the record is correct, stale, duplicated or missing evidence.

You know which record or contributor looks material.
You are in the correct portfolio.
You have the source evidence available if the record needs correction.
You understand whether the contributor is an asset, debt, import, valuation or FX issue.
You are ready to leave a note when you correct or explain the record.

Detailed steps

01

Start from the records most likely to explain the change

Use Largest positions or the movement contributor list to identify the records that matter. Focus on material rows first. Check name, category, liquidity, invested amount, owned value and source before opening the detail.

Use Largest positions to decide which contributor deserves record-level review.
02

Open Details for the contributor

Open the underlying asset or liability. The detail screen is where you verify the saved record rather than guessing from dashboard totals. Start with the primary tab, then move to Value, Notes and Documents when needed.

Open the underlying asset when a contributor needs source, value or liquidity review.
03

Open Value and check the movement-sensitive fields

Use the Value tab to check owned value, amount invested, liquidity, valuation date and valuation method. For market assets, also check ticker, units and currency where available. These fields usually explain whether movement came from price, FX, manual edit or stale metadata.

Use the Value tab to check the fields that usually explain contributor movement.
04

Return to review after correcting the record

After a correction, return to Capital Review or Net Worth. Check whether the issue is still present and whether the movement now makes sense. If the record remains uncertain, add a note or defer the review with a clear reason.

Return to review after correcting the record so you can confirm the issue is understood.

Field guide

Contributor

The record causing a meaningful change or review item.

Open the largest or most surprising contributor first.
Owned value

The value counted in the portfolio.

Compare it with the latest source.
Amount invested

Cost basis or paid-in amount when known.

Do not confuse it with current value.
Valuation date

Date the value represents.

Old dates can explain stale or misleading movement.
Valuation method

How the value was supported.

Manual entry, appraisal, manager report and market quote mean different things.
Liquidity

How accessible the value is.

Liquidity changes can matter even when value is unchanged.
Source

Evidence behind the saved value.

Use documents or notes when another reviewer would need context.

Decision rules

What it adds

  • Provides a concrete audit path from dashboard movement to record-level evidence.
  • Reduces confusion between value changes and data edits.

What it does not do

  • Contributor detail cannot recover missing historical metadata.
  • It does not certify that source values are correct.

Common mistakes

What to check

  • Be cautious when old snapshots did not include ticker, quantity or quote currency.
  • Use notes when correcting a value so future movement is easier to explain.

Opening small records before checking the material contributor.

Changing the current value without updating valuation date or method.

Treating cost basis as current value.

Ignoring currency or FX context.

Leaving a duplicate imported row active.

Marking a review item complete without checking the affected record.

Correcting a record without adding notes when the reason is not obvious.

After you save

  • Reopen Net Worth and confirm totals changed as expected.
  • Reopen Capital Review if the contributor was part of a review item.
  • Attach or preserve the source document when the value is material.
  • Add a plain-language note for manual corrections.
  • Use Defer when the correct evidence is not available yet.
  • Do not present unexplained movement as verified performance.

Keep reading